M II A II R II K
Senior Member
The Progress station could be changed to a station that actually connects to the mall.
|
|
|
That would have been redundant I think.The Progress station could be changed to a station that actually connects to the mall.
Kind of a waste of money, frankly.Ridings along Sheppard voted PC - so I guess this will be happening. I wouldn't be surprised if a Western extension gets done as well at this point (It would be a good thing)
My brother in Christ this is Doug Ford we’re talking aboutKind of a waste of money, frankly.
Not completing the line to maximize its potential makes the initial investment and ongoing operational costs a waste of money. The corridor's density is increasing rapidly, a northern crosstown is a good thing in my opinion with opportunities to go south and hit Wilson and Lawrence Avenue WestKind of a waste of money, frankly.
Ridings along Sheppard voted PC - so I guess this will be happening. I wouldn't be surprised if a Western extension gets done as well at this point (It would be a good thing)
A full crosstown Shepherd has loads of potential--with multiple interchanges within the expanding network--esp considering that this is an honest to god subway, unlike the watered down hybrid a few klicks to the south.Kind of a waste of money, frankly.
Sunk cost fallacy.Not completing the line to maximize its potential makes the initial investment and ongoing operational costs a waste of money. The corridor's density is increasing rapidly, a northern crosstown is a good thing in my opinion with opportunities to go south and hit Wilson and Lawrence Avenue West
A proper crosstown Sheppard line is going to cost $15bn. Better off to start a new line from scratch that doesn't require tunneling the entire route.A full crosstown Shepherd has loads of potential--with multiple interchanges within the expanding network--esp considering that this is an honest to god subway, unlike the watered down hybrid a few klicks to the south.
Are we going to have this debate again? You don't need to tunnel the entire route.A proper crosstown Sheppard line is going to cost $15bn. Better off to start a new line from scratch that doesn't require tunneling the entire route.
Living on the line - the alternative of having all those people on the 85 bus is worse. If anything, more rapid transit is needed both east and west.Sunk cost fallacy.
A new line? Will we ever need a "brand new line" after the Ontario Line besides extending existing lines?A proper crosstown Sheppard line is going to cost $15bn. Better off to start a new line from scratch that doesn't require tunneling the entire route.
1000% agree with this. Sheppard Avenue is wide enough in part of the stretch especially east of Victoria Park and west of Bathurst.Are we going to have this debate again? You don't need to tunnel the entire route.
We'll see what the plan is. I predict it will be 100% tunneled and very expensive. Extension to Sheppard West is not on the table for the next half century.Are we going to have this debate again? You don't need to tunnel the entire route.
This will be built in one shot. Sheppard West to McCowan.We'll see what the plan is. I predict it will be 100% tunneled and very expensive. Extension to Sheppard West is not on the table for the next half century.
There is no indication that Sheppard West is even being contemplated by the province.This will be built in one shot. Sheppard West to McCowan.