Though I think it is more common for developers to retain ownership of retail spaces, here it is for sale.

$10,500,000

Favourite

#1 -75 THE ESPLANADE ST
Toronto, Ontario M5V1Z4​

MLS® Number: C5475236

Highlights


icon_neighbourhood_gray.svg

Neighbourhood
Statistics
Calculators

Description​

Rare Opportunity To Acquire A Signature Retail Asset In One Of Toronto's Most Iconic Neighbourhoods. The Retail Premises Features Over 150+ Ft Of Frontage On The Esplanade & Church Street, A Double Height Glass Fa?ade, & A Large Patio Offering. Comprised Of 8,547 Sf On The Ground Floor And 3,250 Sf On The Mezzanine Level, Totalling 11,797 Sf. The Newly Constructed Retail Space Has 22+ Ft Ceiling Heights On The Ground And 10.9 Ft On The Mezzanine Level.**** EXTRAS **** Stratified Freehold. Located On The Southwest Corner Of The Esplanade And Church Street At The Base Of A Luxury Condo Development, 75 On The Esplanade. Shared Type G Covered Loading Dock With Direct Access At Grade Into The Retail Premises. (29428205)
 
It looks like the insulation has been delivered. Maybe things will be completed soon? :) How long has it been? At least 8 months since the canopy supports have been installed. I can’t recall when the mechanical room cladding was “almost” completed. Probably similar timing. Hard to believe they would leave the mechanical room wall exposed for so long.
The pool area looks nice. Even in the rain at night. I have not seen anyone use it, so maybe it hasn’t officially opened? They tented the pool in the winter/ spring for an assuming early summer completion.
86DEA18F-9A0A-4342-A88F-451AFA4EF739.jpeg


8E06D3B0-35E5-40E6-ABCF-F83AD2F79DFC.jpeg


A40EF8AF-97FE-4C4D-8902-490FEBB69129.jpeg


0B8D11D8-808E-464F-8059-6AD5376715B6.jpeg


B718B230-71F1-4439-B5A1-8DB00E87C6D9.jpeg


D2E06B77-A7FF-4010-86A7-4422562509E0.jpeg


1FD881F8-1907-46C0-8464-F58E86751D3A.jpeg
 
It looks like the insulation has been delivered. Maybe things will be completed soon? :) How long has it been? At least 8 months since the canopy supports have been installed. I can’t recall when the mechanical room cladding was “almost” completed. Probably similar timing. Hard to believe they would leave the mechanical room wall exposed for so long.
The pool area looks nice. Even in the rain at night. I have not seen anyone use it, so maybe it hasn’t officially opened? They tented the pool in the winter/ spring for an assuming early summer completion.


View attachment 418159

Great update.

I agree, the bathtub does look nice.
 
As it is classified as a 'public pool' - like all condo pools - it needs to be inspected by Toronto Public Health before it can be opened. I understand they are very backlogged as most inspectors are on covid-duty.
 
That's really nice and airy...much more than I was expecting. A place where I could watch my cats curl up in the sun all day on a fantasy income...
 