Why would unit 827 be on what appears to be the 5th floor?

42

because the residential units start at Floor #6 .. so essentially the two first floors (the retail ones) are equivalent to 5 floors.. this is because each retail floor is 20+ foot.. so 40 feet combined for two retail floors.. 40 feet divided by 8 foot (standard residential height) is equal to 5 floors..
 
because the residential units start at Floor #6 .. so essentially the two first floors (the retail ones) are equivalent to 5 floors.. this is because each retail floor is 20+ foot.. so 40 feet combined for two retail floors.. 40 feet divided by 8 foot (standard residential height) is equal to 5 floors..

So the elevators are going to have a button for G then 2 or 3 then 6? I thought floors were counted by the actual floor and not the stories that floor takes up.
 
because the residential units start at Floor #6 .. so essentially the two first floors (the retail ones) are equivalent to 5 floors.. this is because each retail floor is 20+ foot.. so 40 feet combined for two retail floors.. 40 feet divided by 8 foot (standard residential height) is equal to 5 floors..
Nobody in the Toronto development industry thinks in 8 foot increments. That may have been a standard height 30 years ago, but not now. Making the first floor above the retail levels #6 is pure goofiness.

42
 
I'm just explaining the logic that was probably used to justify starting at 6th floor.. I don't have any information on elevator buttons, that would probably be revealed on occupancy but im almost sure that they will match the unit numbers.. so to access 827, you press 8.. it makes sense.. if you think that skipping floor numbers in an elevator is weird, you should see how hotels manage that too.. a lot of them would start at much higher floor to account for all the super high utility floors below it (lobby, ballroom, gym, pool, etc)..

8 foot increments is what 40/5 is.. that's how i came up with it.. the building itself has 8 foot ceilings for some of the units so I don't see why they didn't use that logic .. they probably should have used 9'.. and by the way, they just said that the retail floors are 20+ foot.. so maybe its not 40/5, but 45/5=9 foot ceilings..
 
I'm just explaining the logic that was probably used to justify starting at 6th floor.. I don't have any information on elevator buttons, that would probably be revealed on occupancy but im almost sure that they will match the unit numbers.. so to access 827, you press 8.. it makes sense.. if you think that skipping floor numbers in an elevator is weird, you should see how hotels manage that too.. a lot of them would start at much higher floor to account for all the super high utility floors below it (lobby, ballroom, gym, pool, etc)..

8 foot increments is what 40/5 is.. that's how i came up with it.. the building itself has 8 foot ceilings for some of the units so I don't see why they didn't use that logic .. they probably should have used 9'.. and by the way, they just said that the retail floors are 20+ foot.. so maybe its not 40/5, but 45/5=9 foot ceilings..

The logic of floor number matching the unit numbers makes sense as that's how it is in majority building. Every condo I've been in with different sized floors still counts the floors and not the stories. If the second level is 25 feet above the first it is still counted as the second floor.

The fact that the "8th floor" is actually the 5th walkable level is the weird part as that is very uncommon in new condos anywhere.

To further the claim they released a notice on February 28th saying that level 4 was currently in progress.

https://www.artshoppecondos.com/construction.php#cons-noticeboard

If you look back in this thread to the pictures from February 28th, you'll notice their level 4 is what you consider the 7th floor.
 
I'm just explaining the logic that was probably used to justify starting at 6th floor.. I don't have any information on elevator buttons, that would probably be revealed on occupancy but im almost sure that they will match the unit numbers.. so to access 827, you press 8.. it makes sense.. if you think that skipping floor numbers in an elevator is weird, you should see how hotels manage that too.. a lot of them would start at much higher floor to account for all the super high utility floors below it (lobby, ballroom, gym, pool, etc)..

8 foot increments is what 40/5 is.. that's how i came up with it.. the building itself has 8 foot ceilings for some of the units so I don't see why they didn't use that logic .. they probably should have used 9'.. and by the way, they just said that the retail floors are 20+ foot.. so maybe its not 40/5, but 45/5=9 foot ceilings..
Everyone understands how suite and floor numbering works… and even how they relate to elevator buttons. Even some of us site administrators get it. What I'm telling you is that basing the floor number on 8 foot increments would be pandering to way-out-of-date notions and is therefore patently ridiculous. I know that the fire department is not a fan of messing with floor numbering.

42
 
Everyone understands how suite and floor numbering works… and even how they relate to elevator buttons. Even some of us site administrators get it. What I'm telling you is that basing the floor number on 8 foot increments would be pandering to way-out-of-date notions and is therefore patently ridiculous. I know that the fire department is not a fan of messing with floor numbering.

42

again, im not telling you how elevator buttons work, i was responding to an earlier question about elevators and how they would be mapped.. so this has nothing to do with being an administrator..

also, re-iterating my point that 8 foot increments was my assumption based on a calculation.. it could be 9' because those retail floors are supposedly 20+..

The purpose behind all of this is obviously more about marketing than anything else.. to give you the sense that your 3rd floor condo is actually a 6th floor equivalent.. it's a three floor bump.. if you think about it from a vertical height perspective, you're not getting robbed, you're being given an exact proximation of how elevated you'll be.. from a re-selling perspective, your apartment unit number will be equivalent to other residential building that don't have gigantic retail floors.. from a firefighter perspective, reaching unit 829 would require the same flight of stairs as an 8th floor unit in a regular residential building (with standard 8-10' floor heights).. and the floors could certainly be labeled inside the staircase even the floor is not walkable..
 
The logic of floor number matching the unit numbers makes sense as that's how it is in majority building. Every condo I've been in with different sized floors still counts the floors and not the stories. If the second level is 25 feet above the first it is still counted as the second floor.

The fact that the "8th floor" is actually the 5th walkable level is the weird part as that is very uncommon in new condos anywhere.

To further the claim they released a notice on February 28th saying that level 4 was currently in progress.

https://www.artshoppecondos.com/construction.php#cons-noticeboard

If you look back in this thread to the pictures from February 28th, you'll notice their level 4 is what you consider the 7th floor.

Ya you're right.. I actually visit that page pretty frequently and I did notice that they used this terminology. I think from a construction project management point of view, level 3 is actually the 6th floor..

The reason I'm saying all of this is not because I enjoy their numbering convention, it's because i've been anxiously waiting for this building to get built.. Residential floors (according to sales, marketing, etc) only start at 6th floor.. Also, I have looked at the balcony configurations to map out where some of the units are, and it seems to be accurate..
 
June 11
IMG_20180611_160112.jpg IMG_20180611_160117.jpg
June 12
IMG_20180612_112500.jpg IMG_20180612_112516.jpg IMG_20180612_112520.jpg
June 13
IMG_20180613_132757.jpg IMG_20180613_132819.jpg
June 14
IMG_20180614_151721.jpg IMG_20180614_151724.jpg
June 15

IMG_20180615_144154.jpg IMG_20180615_144158.jpg
 

Attachments

  • IMG_20180611_160117.jpg
    IMG_20180611_160117.jpg
    329.2 KB · Views: 397
  • IMG_20180611_160112.jpg
    IMG_20180611_160112.jpg
    323.1 KB · Views: 420
  • IMG_20180612_112520.jpg
    IMG_20180612_112520.jpg
    206.2 KB · Views: 420
  • IMG_20180612_112500.jpg
    IMG_20180612_112500.jpg
    168.8 KB · Views: 405
  • IMG_20180612_112516.jpg
    IMG_20180612_112516.jpg
    217.7 KB · Views: 430
  • IMG_20180613_132757.jpg
    IMG_20180613_132757.jpg
    260.2 KB · Views: 440
  • IMG_20180613_132819.jpg
    IMG_20180613_132819.jpg
    199.2 KB · Views: 437
  • IMG_20180613_132802.jpg
    IMG_20180613_132802.jpg
    274.7 KB · Views: 390
  • IMG_20180615_144158.jpg
    IMG_20180615_144158.jpg
    319.2 KB · Views: 400
  • IMG_20180614_151721.jpg
    IMG_20180614_151721.jpg
    297.3 KB · Views: 417
  • IMG_20180614_151724.jpg
    IMG_20180614_151724.jpg
    326.6 KB · Views: 421
  • IMG_20180615_144154.jpg
    IMG_20180615_144154.jpg
    322 KB · Views: 407
June 18
IMG_20180618_145933.jpg IMG_20180618_145937.jpg
June 19
IMG_20180619_152714.jpg IMG_20180619_152732.jpg
June 20
IMG_20180620_160901.jpg IMG_20180620_160905.jpg
June 22
IMG_20180622_153309.jpg IMG_20180622_153312.jpg
 

Attachments

  • IMG_20180618_145933.jpg
    IMG_20180618_145933.jpg
    313.1 KB · Views: 428
  • IMG_20180618_145937.jpg
    IMG_20180618_145937.jpg
    310.3 KB · Views: 417
  • IMG_20180619_152714.jpg
    IMG_20180619_152714.jpg
    322.7 KB · Views: 425
  • IMG_20180619_152732.jpg
    IMG_20180619_152732.jpg
    337 KB · Views: 429
  • IMG_20180620_160901.jpg
    IMG_20180620_160901.jpg
    322.2 KB · Views: 401
  • IMG_20180620_160905.jpg
    IMG_20180620_160905.jpg
    322.9 KB · Views: 403
  • IMG_20180622_153309.jpg
    IMG_20180622_153309.jpg
    300 KB · Views: 410
  • IMG_20180622_153312.jpg
    IMG_20180622_153312.jpg
    309.6 KB · Views: 418
June 25
IMG_20180625_161329.jpg IMG_20180625_161338.jpg
June 26
IMG_20180626_141011.jpg IMG_20180626_141015.jpg
Does anyone know what these protruding thingies are?
IMG_20180626_141037.jpg
June 27
IMG_20180627_164938.jpg IMG_20180627_164942.jpg
Some escalator action (so this explains that opening in the concrete on the 2nd level, poured many moons ago)
IMG_20180627_121609.jpg
June 28
IMG_20180628_142502.jpg IMG_20180628_142508.jpg
June 29
IMG_20180629_150750.jpg IMG_20180629_150753.jpg
More escalator action
IMG_20180629_150747.jpg
 

Attachments

  • IMG_20180625_161329.jpg
    IMG_20180625_161329.jpg
    298.2 KB · Views: 392
  • IMG_20180625_161338.jpg
    IMG_20180625_161338.jpg
    343.9 KB · Views: 412
  • IMG_20180626_141011.jpg
    IMG_20180626_141011.jpg
    304.3 KB · Views: 408
  • IMG_20180626_141015.jpg
    IMG_20180626_141015.jpg
    306.2 KB · Views: 436
  • IMG_20180626_141037.jpg
    IMG_20180626_141037.jpg
    251.2 KB · Views: 419
  • IMG_20180627_164938.jpg
    IMG_20180627_164938.jpg
    316 KB · Views: 384
  • IMG_20180627_164942.jpg
    IMG_20180627_164942.jpg
    258.3 KB · Views: 399
  • IMG_20180627_121609.jpg
    IMG_20180627_121609.jpg
    201.1 KB · Views: 417
  • IMG_20180628_142502.jpg
    IMG_20180628_142502.jpg
    296 KB · Views: 431
  • IMG_20180628_142508.jpg
    IMG_20180628_142508.jpg
    315.5 KB · Views: 392
  • IMG_20180629_150750.jpg
    IMG_20180629_150750.jpg
    324 KB · Views: 381
  • IMG_20180629_150753.jpg
    IMG_20180629_150753.jpg
    334 KB · Views: 399
  • IMG_20180629_150747.jpg
    IMG_20180629_150747.jpg
    232.5 KB · Views: 411
First precast sections are up now
image.jpg
image.jpg
image.jpg
image.jpg
image.jpg


And some more of those steel box frames attached to the edges of the floor plates
image.jpg
image.jpg
image.jpg
 

Attachments

  • image.jpg
    image.jpg
    252.3 KB · Views: 560
  • image.jpg
    image.jpg
    190.9 KB · Views: 534
  • image.jpg
    image.jpg
    184.2 KB · Views: 597
  • image.jpg
    image.jpg
    114.3 KB · Views: 529
  • image.jpg
    image.jpg
    180 KB · Views: 539
  • image.jpg
    image.jpg
    155.2 KB · Views: 530
  • image.jpg
    image.jpg
    191.6 KB · Views: 541
  • image.jpg
    image.jpg
    107.7 KB · Views: 531
Today.
8F11A464-9023-4275-8C0D-6FB030F6266F.jpeg
441E5C3B-C8D9-46B9-AF77-F3C5C3EC4D97.jpeg
33DEA038-A39E-4572-9DE3-AF4AEDD1FE12.jpeg
 

Attachments

  • 8F11A464-9023-4275-8C0D-6FB030F6266F.jpeg
    8F11A464-9023-4275-8C0D-6FB030F6266F.jpeg
    240.8 KB · Views: 703
  • 441E5C3B-C8D9-46B9-AF77-F3C5C3EC4D97.jpeg
    441E5C3B-C8D9-46B9-AF77-F3C5C3EC4D97.jpeg
    289.6 KB · Views: 670
  • 33DEA038-A39E-4572-9DE3-AF4AEDD1FE12.jpeg
    33DEA038-A39E-4572-9DE3-AF4AEDD1FE12.jpeg
    297.9 KB · Views: 694
First windows panels installed and some more precast from today:

image.jpg

image.jpg

image.jpg

image.jpg

image.jpg

image.jpg

image.jpg
 

Attachments

  • image.jpg
    image.jpg
    188.4 KB · Views: 646
  • image.jpg
    image.jpg
    211.4 KB · Views: 655
  • image.jpg
    image.jpg
    139.7 KB · Views: 647
  • image.jpg
    image.jpg
    195.4 KB · Views: 374
  • image.jpg
    image.jpg
    141 KB · Views: 618
  • image.jpg
    image.jpg
    141.7 KB · Views: 669
  • image.jpg
    image.jpg
    141.2 KB · Views: 603
  • image.jpg
    image.jpg
    205 KB · Views: 635

Back
Top