• Thread starter Suicidal Gingerbread Man
  • Start date
From the North
8DD692C9-6337-414F-AD33-D64D3FEB26DE.jpeg
 
Drippy Friday

BONUS PIC!

Looking at the exterior of the walkway from the present bus terminal towards Union Station, usually called Platform 3. It was raining and I didn't want to stop to take more, but the steel beams (Clifford Restorations) cross Bay St on the north side between the East and West Bay St Teamway. Eventually, a new pedestrian bridge will be installed in front of this heritage steel cladding. Is it possibly ArtDeco in design?

202495


Westside UP

202496


Westside DOWN

202497


Eastside General

202498


Skipping the corrugated metal decking on level#5 they've decided to complete level#6 first

202500


The Great Canadian Cover-Up level#6

202499


A closer look at the almost finished concrete work for level#4

202501


The blue concrete pump #3 was sadly removed on Wednesday and was quickly covered up today. All that remains is a steel projection waiting for a future post and beam

202502
 
Drippy Friday

BONUS PIC!

Looking at the exterior of the walkway from the present bus terminal towards Union Station, usually called Platform 3. It was raining and I didn't want to stop to take more, but the steel beams (Clifford Restorations) cross Bay St on the north side between the East and West Bay St Teamway. Eventually, a new pedestrian bridge will be installed in front of this heritage steel cladding. Is it possibly ArtDeco in design?

View attachment 202495

Westside UP

View attachment 202496

Westside DOWN

View attachment 202497

Eastside General

View attachment 202498

Skipping the corrugated metal decking on level#5 they've decided to complete level#6 first

View attachment 202500

The Great Canadian Cover-Up level#6

View attachment 202499

A closer look at the almost finished concrete work for level#4

View attachment 202501

The blue concrete pump #3 was sadly removed on Wednesday and was quickly covered up today. All that remains is a steel projection waiting for a future post and beam

View attachment 202502
Stitched! (and squished apparently)
Untitled_Panorama1.jpg
 
Last edited:
141 Bay St – Application to Remove the Holding Symbol From the Zoning By-Law – Final Report ,, https://www.toronto.ca/legdocs/mmis/2019/te/bgrd/backgroundfile-136815.pdf

This application proposes to remove the Holding symbol (h) from Block 1a of the lands bounded by Bay Street, Yonge Street, 1 Front Street West and the Rail Corridor (municipally known in 2018 as 141 Bay Street and the portion of lands designated for Transportation uses between Bay and Yonge Streets)
to permit the development of a 53-storey office tower with a 7-storey podium.
 