• Thread starter Suicidal Gingerbread Man
  • Start date
Kind of crazy to me that the lights are on on practically every single floor. Surely they can turn some of those off when they’re unoccupied.
They do turn off after around 30 mins of no motion. Not sure when the photos taken but the cleaning staff may be why it’s on. They should turn the lights and massive screen in the banking centre off at night though.
 
Wednesday, Nov. 16
Backstage
F55447D2-4CA4-4BFC-92C2-AF308A5EC07D.jpeg


410DC90F-3427-4418-BA6A-55D8E278BCE1.jpeg


Thursday Nov 19
Working late on the last south side cantilevered beam.
5457AB9F-39A0-434F-AA5D-071D84E51A48.jpeg


Sat Nov 20
Cleaning up the edge.
30C35556-04AF-4D01-910B-30D4F114F5D1.jpeg


Going back 1 week.
Sunday, Nov. 13
A7A9A8FA-E199-4D63-BB30-E3BC6CA81793.jpeg


P5-P1
0CEEC901-844C-4596-9766-54A82CFE487B.jpeg


1A590F24-C189-4163-A3B7-29ECAB1122C4.jpeg


569D4415-0F63-48BE-A763-67034823DE20.jpeg


P5-P1
9FCE1230-CC02-4BB5-B747-D6BD23B6C1AB.jpeg


P5,P4
37E1C397-2810-4B64-ADDC-F494D924349B.jpeg


Core moving up more level
B0EE353C-8818-4FE6-9BD8-985280ECDD31.jpeg


CE7D43F4-A108-4DE9-8479-624C71766505.jpeg


Nov 2 The Esplanade from Market St. to Yonge.
757AAB56-13CA-4E10-93AC-BF2D4E2A429C.jpeg
 
I just realized from the renders how much the 2nd tower is going to balance on the elevator core without really any other support columns, outside the ones funneling the weight into the core. That's a little scary come to think about it.
Perhaps that is why the core has taken longer than phase one to reach this level. The amount of Rebar must be insane.
 
Last edited by a moderator:
Perhaps that is why the core has taken longer than phase one to reach this level. The amount of Rebar must be insane.
It reminds us why The One was so slow in getting its feet off the ground. That is, a lot of complex maneuvering to get the building's weight redistribution mechanics just right.
 
Last edited by a moderator:
Two pictures of the bridge this morning and the rest from Saturday.

Getting ready to pour a new edge next weekend?
10FDF282-D0D6-4B5D-B492-EEFC34C16965.jpeg


0717F1C7-9D9B-4818-BFE1-73BC74E7E161.jpeg


Golden hour Saturday morning.
2D86374F-CB94-4657-B0B6-91196F31ADBE.jpeg



AB67059A-5006-44A1-9ACE-7BA5DFE347BF.jpeg


02B91BF0-BC92-48EF-AF8E-F010FF60A105.jpeg


189567B9-7319-4B15-828A-B1B7547951AB.jpeg



15828A1A-526E-4EBA-A4AC-E4B98BE3D53E.jpeg


2DE28E12-0115-42A9-82DF-8EEE7B655505.jpeg


63147803-758B-434E-8186-3BF0726ED27E.jpeg



Why not one more expanded view since I went to the trouble of removing the electrical wires in Lightroom.

Shot between the fence/gate on Sherbourne.
The new track control lights seem to naturally block 16 Yonge .
7763D68D-8874-4370-8BEC-EDFCC87DA36E.jpeg
 
Two pictures of the bridge this morning and the rest from Saturday.

Getting ready to pour a new edge next weekend?
Yes, they seem ready to tidy it up but I will be interested to see if they then start to construct the NEW bridge. Has anyone an idea if it will be poured, hoisted into place or 'bolted' to the current rail bridge?
 
Last edited by a moderator:

Back
Top