Any guesses on when the Bay St pedestrian overpass will open? Could it open prior to the entire building being completed?
 
A York chiller and heat exchanger were delivered today
The tower crane cables were doubled up again and straps were used to lengthen the reach for the lift of the probably 30,000 lb? chiller to 8th floor mechanical room.

Front side
IMG_7060.jpeg


Back side
IMG_7062.jpeg


Lifted to the roof and probably pulled into the mechanical room.
IMG_7061.jpeg


IMG_5763.jpeg


IMG_5760.jpeg


IMG_5754.jpeg


IMG_5766.jpeg
 