from this morning...

6056583228_73a65f0bf6_b.jpg

Redroom, thanks for sharing this phenomenal pic!
 
drum118 have you heard of a specific date and time for the lift? Let us know when you find out. I don't want to miss it.
 
1meYB.jpg


So the south end of this bridge will empty into an active construction site? How is this going to work?
 
i'm sure that has to do with two things. the foot of the ramp needs to line-ip with a yet-to-be built traffic light. also, the incline has to accessible to disabled people.
 
Aug 29
Most of the form work has been stripped from the south ramp. The rest should be gone by the weekend.

A new pad at the base connect to the street should be pour by now.

2 huge base at the bottom to support something of weight or tall.

Steel deck is down with nelson studs where there are no joints at this time. The bridge will be completed early next week for the erection for Sept 9-11 as it stands now.
6098628825_4af1af68a6_b.jpg


6098628473_3a2fe68d5f_b.jpg


6099170748_9f6f356713_b.jpg


6098621209_3ca1e15eba_b.jpg


6099168494_d94edc62ec_b.jpg


6099171464_486739688e_b.jpg
 
There better not be any persnickety rules about cycling up and down the vast stretches of ramp, as opposed to dismounting and walking.

Those Gotrain nazis imposed their overwrought requirements and forced a pure idea into something convoluted.
 
I wonder when it will open to the public, as the south side still opens into an active construction site.
 