Unfortunately the same statement has been made since 2014 or so. The current page for the website says:.
"The new Caledonia GO Station is currently in procurement, which will continue along with detailed design work through 2021. Construction will begin in 2022 and take approximately two years to complete."
Posted here April 24, 2015 in the GO Service thread:
And it was old news even then because there was a study in September 2013 that explained the layout of the station.
All to say that without a construction contract signed... nothing is happening.
"The new Caledonia GO Station is currently in procurement, which will continue along with detailed design work through 2021. Construction will begin in 2022 and take approximately two years to complete."
Posted here April 24, 2015 in the GO Service thread:
Stop on the Barrie line at Eglinton is a, well, go.
http://www.newswire.ca/en/story/1524297/metrolinx-moving-forward-with-plans-for-caledonia-go-station
And it was old news even then because there was a study in September 2013 that explained the layout of the station.
All to say that without a construction contract signed... nothing is happening.