EnviroTO
Senior Member
Things are looking good at most stations. At Mount Pleasant where they were quite behind the frame of the historic bank building frame has gone up and they have installed scaffolding to started brickwork. They are also pouring some sidewalks and road bases with traffic likely to shift sides this week and the temporary bridge that existed will be removed. At Eglinton the deep hole on the old bus barn site has iron work reaching the surface ready to get a cement pour, and under Eglinton they have started putting dirt on top of the station box and loading it as they build back up to street level.