nfitz
Superstar
Unlikely. They shouldn't be going from a 2031 peak of about 5,000 to tens of thousands anytime soon. The modelling assumed that the line went all the way to Pearson.Or maybe capacity actually is going to be a bigger problem overall than expected
If capacity is an issue, I'd think the impact to Line 1 at Eglinton would be a bigger problem. Line 5 can be easily fixed by ordering some more LRVs.