|
|
|
i can see why they did it to begin with... verster in 2020 publically started the cat fight with crosslinx and this is the result of it. the ford govt is trying to prevent another public meltdown but obviously the pandoras box has been opened already.ML communication should not be censored by Ford but if their excuse is that it is hurting ML reputation, it's a bit late for that.
I'm guessing this is a technicality. You're allowed to speak up so long as you're ready to face the consequences of what you say. Its as if I say "You can kill anyone you like, so long as you're ready to face whatever life sentences you're ready to face" - it might be true in the most technical senses.
Truthfully it would be terrible either way. It's either lazy and clueless ttc management or the partisan and equally lazy politiciansbit my tongue on the construction/dbf aspect for too long. this project has dragged to the point it's an embarrassment on a provincial scale. "we're taking over transit because we'll build it faster, cheaper, better". #fail #fail #fail. The centrepiece of the Prov's grand transit plan, cut short on the west, and on the east, then on the west again, single phase to two, to three, to five phases. Just the first phase is well, well beyond its schedule (and we're still in the dark!).
Truthfully it would be terrible either way. It's either lazy and clueless ttc management or the partisan and equally lazy politicians
Not to mention the East phase isn't even on the provinces radar anymore, it's a City project again. And is now a total separate line because MX made a direct connection impossible because of how they designed the SSE.bit my tongue on the construction/dbf aspect for too long. this project has dragged to the point it's an embarrassment on a provincial scale. "we're taking over transit because we'll build it faster, cheaper, better". #fail #fail #fail. The centrepiece of the Prov's grand transit plan, cut short on the west, and on the east, then on the west again, single phase to two, to three, to five phases. Just the first phase is well, well beyond its schedule (and we're still in the dark!).
Not to mention the East phase isn't even on the provinces radar anymore, it's a City project again. And is now a total separate line because MX made a direct connection impossible because of how they designed the SSE.
Most riders are transferring to and from the subway, the ridership east and west of Kennedy is quite different, not at all worth the extra cost of a through line, and the operational issues with such a long line.Eglington East will be a repeat of the Scarborough RT. A weird forced-transfer appendage of a line that should of just been an extension in the first place. And they have plenty of space for an elevated line out there...
Most riders are transferring to and from the subway, the ridership east and west of Kennedy is quite different, not at all worth the extra cost of a through line, and the operational issues with such a long line.
Yes exactly, and there are a large number of technical issues surrounding its ability to be connected to Line 5. The new case of the Eglinton East LRT better fits the local context.Most riders are transferring to and from the subway, the ridership east and west of Kennedy is quite different, not at all worth the extra cost of a through line, and the operational issues with such a long line.