Given that this is Toronto, I am surprised they haven't blocked off the sidewalk anywhere near the dismantling-in-progress.
 
Nothing this past weekend.

IMG_4878.JPG
IMG_4879.JPG
 

Attachments

  • IMG_4878.JPG
    IMG_4878.JPG
    303.1 KB · Views: 374
  • IMG_4879.JPG
    IMG_4879.JPG
    588 KB · Views: 398
I got some more pictures today.

34522983442_cd22a0d95f_z_d.jpg

34554196561_c8ec43a9f8_z_d.jpg

They have removed the glass at either end of the bridge and also the streetcar wires were completely cut at either side of it rather then bee taken down from, although the later is no big deal as the TTC is likely to put up new wires on Queen Street anyway in preparation for the new cars to use the pantographs.
34682320165_eb76266087_z_d.jpg

Another look at the Eaton Centre side it's quite the sizable gap in it I wonder how much of a choke point it will be entering into the Bay as it will be remaining the same size.
34554197521_b4f15b9664_z_d.jpg
34522983342_b7940d8553_z_d.jpg

They are starting work on preparing the new span on the roadway between Old City Hall and the Eaton Centre.

33839957164_97e0157092_z_d.jpg

An alook at the inside of the Eaton Centre.
 
It would be nice if they can conveniently knock down a few of those rusty lampposts while they're removing the old bridge.

AoD

They're going to have to remove those posts. It's already a tight fit turning a finished bridge into position without having light poles in the way.

Hopefully they've figured this out with the city who isn't going to put back the old poles and can install new ones since they're way past overdue for replacements.
 
They're going to have to remove those posts. It's already a tight fit turning a finished bridge into position without having light poles in the way.

Hopefully they've figured this out with the city who isn't going to put back the old poles and can install new ones since they're way past overdue for replacements.

I know, I am joking...I think.

AoD
 
I wonder how they will put up the new Streetcar wires as well because apparently because of the thicker gauge of the new ones they need to have heavier post and in some place they can't put footings deep enough for them,
 
I got some picture when I was down there today. It looks like they are relly hacking the bridge to pieces at the ends of it. They also have some heave equipment stationed beside Old City hall possibly to jack up the old bridge and remove it over the long weekend.

34609685031_e08a5e4379_z_d.jpg

34356563760_17cf493b71_z_d.jpg

33898811384_1e4ba859e1_z_d.jpg

34743228875_ebd0c56cf8_z_d.jpg

Work is alo progressing on replacement with some of the structural supports going up in the middle of the sapn.

34611697031_538ea4de89_z_d.jpg
 
And it begins.

City of Toronto Media Relations has issued the following:
==========================================

News Release

May 19, 2017

Closure of Queen Street this weekend for removal of pedestrian bridge

Queen Street between Yonge Street‎ and Bay Street will be closed to vehicles from 11 p.m. Friday, May 19 until 5 a.m.Monday, May 22 for the removal of the pedestrian bridge at the Hudson's Bay Company building. There will also be no access to James Street during this period.

Eastbound traffic on Queen Street will be diverted at Bay Street while westbound traffic will be diverted at Yonge Street.

Pedestrian access will be maintained at all times, however there will be periodic stoppages during crane hoisting work.

The City has a web-based map to help residents and visitors make their travel plans, available at http://www.toronto.ca/roadrestrictions.

This news release is also available on the City's website: http://ow.ly/5m9P30bS7e3

Toronto is Canada's largest city, the fourth largest in North America, and home to a diverse population of about 2.8 million people. It is a global centre for business, finance, arts and culture and is consistently ranked one of the world's most livable cities. In 2017, Toronto will honour Canada's 150th birthday with "TO Canada with Love," a year-long program of celebrations, commemorations and exhibitions. For information on non-emergency City services and programs, Toronto residents, businesses and visitors can visit http://www.toronto.ca, call 311, 24 hours a day, 7 days a week, or follow us on Twitter at http://www.twitter.com/TorontoComms and on Instagram at http://www.instagram.com/cityofto.

-30-

Media contact: Pat Barrett, Strategic Communications, 416-392-4716, pat.barrett@toronto.ca
 

Back
Top