News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.1K     0 

Update for Bathurst and Eglinton.
45B894FC-03AA-4A67-8089-419F0A289ED1.png
 
Just wait until Ontario Line gets started downtown. Laydown and parking space will be very challenging.

I wonder if anyone has thought of requiring construction workers to come by transit or park their cars further away with a dedicated shuttle service. The current mindset which lets construction people park where they like may not be appropriate.

- Paul
They usually get their for 6:xx and a lot of them live further out. I don't see them waking up 40 mins to an hour earlier to take transit.
 
Transit isn't even an option for many. Tons of them are coming in from out of the city, and transit services don't run early enough or frequent enough or reliably enough to get them in on time. Let alone the question of getting boots, extra clothes, and gear over there.

Our transit system is really designed with 9-5 office workers in mind. It's not great for riders outside those parameters
 
Avenue Rd would be a north-south or loop at Avenue Rd and Eglinton. Mount Pleasant would use St Clair/Yonge Station. 34 would disappear or be like 97

That would make sense, but Avenue station won't have a bus terminal, which would be odd unless it continued to Eglinton.
 
That would make sense, but Avenue station won't have a bus terminal, which would be odd unless it continued to Eglinton.
Why have a bus terminal when the bus is running from end to end on the street like the 97 does as an all day line??

That's started already!? Would it be done by 2030?
That video is how old??

As far as I know and stand to be corrected, no EA has started for the extension nor has the GTAA comment to the plan or funding for it. If there is an EA out there, it will have to be dusted off as the transit hub was never in the picture at the time.

If funds could be found for the extension alone with approve EA, 2033-35 would be the timeframe for everything to service the airport. That is VIA, GO Transit, Crosstown and the GTA transit systems.
 
Why have a bus terminal when the bus is running from end to end on the street like the 97 does as an all day line??

I was referring to the Avenue Rd. bus, which I thought was maybe still split as the Nortown West. I didn't realize when I posted it was now combined.

That video is how old??

I didn't actually watch it. I just saw the link and got excited.
 
Last edited:
Last edited:
Caledonia Station is even deeper. It is at the crest of the hill going down to Keelesdale Station.

image-7.png
From link.

The bored tunnels are deep to reduce the transmission of vibration and noise to the surface. Should be quieter than the Line 2 Bloor-Danforth, which was cut-n-cover.
With lighter trains and deeper tunnels, I doubt there will be any noticeable transmission of noise or vibration to nearby residents.

The deep tunnels will be great bomb shelters if we are ever unlucky enough for World War 3.
 
That's an awful amount of empty white space on the walls. That's screaming for some art smh.
No colour allowed. Some orange accents would be nice though...
 

Back
Top