1. What's with everyone mentioning rich people lately?

The growing and accelerating levels of wealth inequality and degrading quality of life in Canada because of our governments failed housing, zoning and immigration policies.

2. How should the signals be setup? Unprotected turns?
Protected lefts but with transit priority.
 
with the resumption of LRT testing along the line does anyone know if thats because the latest software patch has been applied and/or the track has been fully repaired?
 
with the resumption of LRT testing along the line does anyone know if thats because the latest software patch has been applied and/or the track has been fully repaired?
One thing metrolinx is really good at is not having much leakers.

The only news we get from the crosstown is from metrolinx or IO themselves. When Phil went and said "were have 0 clue" back last october that was a complete shock. No one had advance knowledge of that.
 

On Saturday, May 11 there will be an increase in the number of light rail vehicles (LRVs) travelling along the ECLRT alignment as part of testing work for the project. This work will ensure that all software and control systems are tested and work properly.​


A good day for LRV-spotting!

hoping that this latest software patch is the final one...
 
Could the opening date be announced in June for the September opening date??
giphy.gif
 
0% chance this is opening in September, sorry to break the news to you.
I still do not understand why they can't "half open" part of the line, while still fixing those small parts where the problem remains.
Surely the remaining complications are only in select locations, and not applied to the whole line...???
Sorry, not trying to rant, just frustrated like everyone else waiting...and waiting... :confused:
 
I still do not understand why they can't "half open" part of the line, while still fixing those small parts where the problem remains.
Surely the remaining complications are only in select locations, and not applied to the whole line...???
Sorry, not trying to rant, just frustrated like everyone else waiting...and waiting... :confused:
If anything that might take even longer - systems are so integrated that it would be very difficult to do this. Also, the "remaining complications" are relatively minor, we can wait.

It's not Seattle, where a large section of their under construction Line 2 is being rebuilt before it even opens - so they opened a "finished" section early
 