38F004DF-E01A-441D-8B53-06AE7051A2B0.jpeg


ABDAB103-4A6B-4FD6-BA43-CCB687E272C6.jpeg


35E34784-F49A-4424-917D-C3C68DD008B4.jpeg


1787F217-FD4F-4552-A598-B83B0C650328.jpeg


FA237192-AC27-4F55-8692-73A437540081.jpeg


8D195AC4-1D70-464A-A6B1-0BCD8C5D2FD3.jpeg


D781D8A9-C1E7-4024-83F4-50C24EB4DE72.jpeg


5C94A9C3-454B-4CF6-8C12-E78608A47E29.jpeg
 
8 more please. I'd like to get them to go. I have some more parking lots in town for these…

42
 
Yes, developers call the shots but when they work with quality architects like HPA it makes a huge difference. Maybe it's about mutual trust and respect...

I never could have foreseen such a high-quality quality project in a part of town that's been a "throwaway" for decades. The transformation here is incredible.
 
Yes, developers call the shots but when they work with quality architects like HPA it makes a huge difference. Maybe it's about mutual trust and respect...

I never could have foreseen such a high-quality quality project in a part of town that's been a "throwaway" for decades. The transformation here is incredible.
HPA was on design but TFAI are all working drawings here.
 

Back
Top