sunnyraytoronto
Senior Member
It's the wind that blows it that way. ;p
Bazis already built 3 office towers with similar slanted rooftop curves.
Bazis already built 3 office towers with similar slanted rooftop curves.
I am a bit puzzled by the last note on the update: "By fall we aim to be on top of the first tower!" Do they mean they will be taking pictures from the top part of the first tower? There is no way they can top it out, even by late November...
Well, I guess FlyOnTheWall source is better than mine.
My apologies to FlyOnTheWall,.... I was wrong and you were correct for stating Metro would be replacing T&T at EmeraldPark (in post# 872 on July 15th). I was wrong to attack your credibility. This forum should be a place for sharing thoughts, photos, information and ideas. FlyOnTheWall, thanks for sharing.
T&T-Loblaw wasn't happy with all the delays at Emerald Park,... so they bailed. Even now, forget about getting to street level by August,... probably won't even happen by end of the year. Look across the street at Hullmark,... to stay on schedule (opening Fall 2013) they're working in the evening until 7pm - when they have so stop construction noise and there's a skeleton crew working on the weekend. EmeraldPark is dead quite in the evening and weekend.
The vast majority of Condos buyers brought before T&T-Loblaws signed up, so it would have been a bonus for the Asian condo buyers,... but it's generally a non-issue. Since about half of condo buyers are Asian,.... they would have been disappointed,... if they even knew T&T signed up and then bailed.
The one floor of office tenants,.... did they even sell that?
The real losers are the first floor retail buyers,... those that brought in knowing that T&T-Loblaws already signed up for the entire second floor retail space. Many of these were Asian mom&pop small stores and food court restaurants thinking this would be like a mini-Pacific Mall. Surely all these Asian shops-food stands wouldn't have signed up if it was Metro on the second floor,.... As usual, it's the little guys that loses.
This Emerald Park mall would be really odd,... lots of Asian Pacific Mall type shops on the first floor and Metro on the second,.... the first floor retail will surely be dead,.... the anchor tenant for them was supposed to be T&T,.... not Metro. Who shops at Metro anyways? Watch those first floor retailers bail,... EmeraldPark mall will be worst than the 40 year old SheppardCentre.
There was talk some of those small Asian retail shops on the first floor would set up office space on the 3rd,... they're probably looking to bail on both now.
That bank and Starbucks with Yonge street frontage already commited before T&T-Loblaws signed up.
With one new condo openning up every 4 months in downtown North York these days,.... I guess T&T-Loblaws won't have too much difficulty finding another nearby location,... with a more reliable developer,... that can actually deliver as promised on time,....
BTW,... Arghhh,... I can't stand Metro!
Does anyone know what the new store format will be like?
Does anyone know what the new store format will be like?