drum118
Superstar
Jan 14
Like others, they should have repaired the existing handrails on Bloor and not use the run of the mill railing.
They have rebuild the Dupont Bridge edge as well a new concrete deck as far as I could see. The existing rail post are back, but the railing between them that are either new or been modified.
I noticed today there looks like to be an walkway bridge on the west side of the new bridges..
I don't know if they haven't finished the trim work at the Wallace bridge ends or are they planning on covering it like the rest of the ramp.
The bridge on Bloor westside is nicely tag and how long before the eastside gets tag??
Cameras at both ends of the Bloor Bridge
More up on my site
Like others, they should have repaired the existing handrails on Bloor and not use the run of the mill railing.
They have rebuild the Dupont Bridge edge as well a new concrete deck as far as I could see. The existing rail post are back, but the railing between them that are either new or been modified.
I noticed today there looks like to be an walkway bridge on the west side of the new bridges..
I don't know if they haven't finished the trim work at the Wallace bridge ends or are they planning on covering it like the rest of the ramp.
The bridge on Bloor westside is nicely tag and how long before the eastside gets tag??
Cameras at both ends of the Bloor Bridge
More up on my site