Woodbridge_Heights
Senior Member
A little bit old but still interesting with a video to boot.
http://video.concretepumping.com/view_video.php?viewkey=136124592c8d4825a06f
PumpCrete pumped 2,400 cu. yds on a transfer slab on the 11th floor of the new Maple Leaf Square building in Toronto. To do this we set a 40 foot freestanding tower and placing boom on the floor below beside the slab and pumped to it with our 52 meter Schwing pump. I think it's another industry first for us. All this in 16 hours with a single Schwing pump.
Sick video and great song, even if Gavin is a Douche.
Does anyone know why they needed to lay the floor this way instead of using crane lifted concrete tubs?