Once the ramp is remove.When will T2 excavation finish?
I still miss the original design for all 3 towers. I hate this bait and switch.
Feels like they are taking forever to excavate that ramp for T2.
Take a closer look. The ramp into the hole is the only way that they can pour concrete. They don't have a permit to accept concrete from any other area of the site. If you don't have a clue on construction logistics or site logistics because of permit delays (which this site is known to have had) take a closer look before commenting.
With the next phase you have another 5-6 years to look forward to
Is that tall yellow thing a drilling machine? Where are they going to drill?