First of all, dumb idea doing a pour before 8 pm and should been done overnight.for some reason they thought that having a concrete truck pouring concrete and occupying the only lane of Queens Quay during rush hour was a great idea ... and traffic is backed up all the way to yonge from the bridge right now. Its been occupying the lane since 6pm ... and its still going.
Rees?I just uploaded 63 photos of this project shot on May 31 and you can find them in the album also on my site. Show how back log I am for posting photos
There is a hydro duct bank that has collapse near Reese
Rush typoRees?
I have signatures turned off, so I don't see any link to anything for your photos.
Yep I've seen this and other pieces ... literately amazing .. better then even Bloor actually, so much attention to detail
Indeed - and they haven't even planted the double row of trees on the south side yet. Now that EBF LRT is more likely to go ahead, I wonder if the project will get extended eastern soon.
AoD
Where did we see that the EBF LRT is more likely to go ahead? I thought it was still currently in limbo due to lack of funding.
The Liberals included it in their platform.