Something I can't help notice is that there are very few building connections on the extension. The main connections are at VMC (I explain in the post), while all the other stations don't have any. I've read somewhere before that York University Station was suppose to connect to the Archives of Ontario building, is that still a thing (not likely)? And yes, I do understand that most station have panels that can be removed to create new connections, but there are very little on opening day.
Hoping that two of the six stations on this extension will have more usage than Toronto's least used subway station is an exceptionally low standard to hold TYSSE to
Do you mean 1 month?How quickly people forget. From link:
This resulted in a one year delay in construction.
If this occurred in China, they would continue working without stopping for an inquiry. Here in Canada, any kind of an accident on a work-site results in a stoppage.
Not just that, but the TTC could sell advertising rights in that station to Nintendo.The station could be renamed "Kirby East" and we can all pretend it was just all a misunderstanding...
Not just that, but the TTC could sell advertising rights in that station to Nintendo.
It can have a virtual toy vending machine.
You can’t compare HK and Toronto. One has free markets, low taxes, and a dynamic economy. And the other is Toronto.
Parts of it are far better than other stations, it's really a patchwork though, as this illustrates:
Even some top-coat on the concrete would go a long way to improving it. That's *glum*...on a good day.
To put this in further perspective, our current least used station (Bessarion) carries 3,000 people per day. Highway 407 would be lucky to have a sixth the ridership. There are probably hudreds of bus and streetcar stops in the city that have greater ridership than Highway 407. The lack of ridership at this station is going to be unprecedented.
How about a virtual shroom vending machine wall?I would prefer ingesting mushrooms all the time and running through tunnels.
How about a virtual shroom vending machine wall?
That would require platform edge doors. Though if memory serves (having a pizza related mishap) the effects of such a vending machine would permit flying through the tunnels with my dead grandfather while hearing colors and watching my own birth from a yellow submarine.
That would require platform edge doors. Though if memory serves (having a pizza related mishap) the effects of such a vending machine would permit flying through the tunnels with my dead grandfather while hearing colors and watching my own birth from a yellow submarine.
Do you mean 1 month?
Falling drill rig kills one at future site of York University subway - October 11, 2011.
Construction Resumes at York University Station Site - November 11, 2011.
You can’t compare HK and Toronto. One has free markets, low taxes, and a dynamic economy. And the other is Toronto.
It is pretty impressive that Toronto managed to finish 6 subway stations/8 kilometers in a matter of 9 years. What an achievement. Now we can focus on spending the next 10 years in building that one stop subway in Scarborough. With that speed, we will catch up with Madrid soon. I am very excited.