Someone asked a question and did not understand the answer and that why the photo's were posted for Fleet. Not the first time where other thread or OT have taken place in threads.
The only thing I see from the photo's I shot on March 4 and March 22, concrete has been pour between the rails east of Lansdowne.
The battle zone between Dufferin and Oakwood is done as all the holes have been fill with asphalt.
March 22-08
Location of new power ducts on the south end in St Clair W.
Storage area for the ceiling slats and construction material.
Ice hanging from the ceiling over the streetcar tracks in the pass through section.
Concrete pour for the track and hording remove.
Looking east and top of rails same level as road and not raise as phase 1.
Looking west with new concrete pour.
I will park my car in the crosswalk with driver walking back to his car at Lansdowne looking west
Looking east at Lansdowne over another park car in crosswalk at Lansdowne
Cars park in the centre of the road west of Lansdowne
Looking east mid block west of Lansdowne
Storage area
Looking west and existing overhead remove for phase 4.
Looking east
March 4
At Bathurst
Looking west
Looking east
Looking east
Looking west at Lansdowne
Looking east