My lake / (transportation) view someday. Sooner the I may have planned. Not to any accuracy or scale. Anything over ~20 flights doesn’t really matter. No complaints.

Maybe add a rail deck park and remove the highway then it would look like Central Park? Okay, back to work, dreaming is over.

B7D3C26A-CDFD-4F8C-995A-3566148F6883.jpeg
 
March 20
Thats one thick base slab to anchor the towers down. Doing 4 section pour at various times.
46557175515_b6663c8a80_b.jpg

32530656857_c69d7a8e8e_b.jpg

32530656007_4ef82c7cff_b.jpg

40506287933_bd467a67c0_b.jpg

46749206204_4474a21737_b.jpg

46749204144_8d64a65da4_b.jpg

47419609292_134e62f225_b.jpg

46749201804_7d2df54c20_b.jpg

47419608022_a160dd433f_b.jpg

47472534771_48fa35f530_b.jpg

47419606922_6061247c64_b.jpg

47472532431_5f13517d96_b.jpg

47419605742_f3914c9be2_b.jpg

47472529901_a5037067a3_b.jpg

40506278243_eda2797505_b.jpg
 
Hindsight is 20/20, but i wish i had bought shares in any of the major concrete firms in Toronto 10 years ago. I'd be a richer old fart by now.
 
Fantastic pictures everyone ! The mass quantity of rebar takes me back to the days of constructing base slabs at Darlington NGS in the early 80's.
 
That's a honking big raft they have going there.
 
Looks like they are almost ready to pour. Maybe Saturday?
They added two more chutes from my viewpoint, 5 + maybe 5? more mirror image out of my site line and two cranes?
Quick guess at 12,000 m3 of concrete.
How many trucks will be lined up?

F8291CCB-98CC-449D-9EEE-030CE99F4F14.jpeg

Drawing from City of Toronto SPA
07DDD7CC-5C2E-45A7-929E-37CD82EFF08A.jpeg
 
Looks like they are almost ready to pour. Maybe Saturday?
They added two more chutes from my viewpoint, 5 + maybe 5? more mirror image out of my site line and two cranes?
Quick guess at 12,000 m3 of concrete.
How many trucks will be lined up?

View attachment 178841
Drawing from City of Toronto SPA
View attachment 178844

A standard cement truck holds approximately eight cubic yards of concrete, while the larger, articulated trucks (of which there are some, but not that many in Toronto) holds approximately twelve cubic yards of concrete. At a ratio of just over 1.3 cubic yards per cubic meter, 12,000 cubic meters would come to around 15,600 cubic yards. Depending on the mix of standard and extended (articulated) cement trucks, that would work out to a maximum of just under 2,000 truck loads , with fewer loads required if there is a meaningful number of the larger, articulated cement trucks involved in the pour.

I cannot recall the number of truck loads required for the pours at the Minto Quantum project in the Yonge and Eglinton area, the largest single pour in Toronto that I am aware of. When this pour took place in 2007, it required approximately 2,700 cubic meters of Agilia concrete - a record setting amount for a continuous pour of Agilia concrete at that time. The Minto pour was truly a sight to see - three batching plants involved, in different areas of the city, so there was a smooth flow of trucks from three different directions to the Yonge and Eglinton site. There was a large scale private duty police presence around the site, with at least six concrete pumps on working - four on Yonge Street, and at least two in the pit (possibly more) that I can recall.

So if the estimate of 12,000 cubic meters is only half-way accurate (I kind of suspect that the actual pour may be somewhat closer to 5,000 - 7000 cubic meters), it will still be a sight to see when it takes place.
 
Last edited:
^^^^ Will definitely be a sight to see

There was a raft slab pour in Houston a few weekends ago for Hines Texas Tower that was 12' thick in the interior portion - 8' deep around the perimeter .

Over 1,700 trucks pouring 13,799 cubic yards (10,500m3) over 20 hours. That's one truck every 45 seconds.

D1bZxdVW0AA-P50.jpg


 
Last edited:
They are pouring today with 9 feeds.
It looks like the NW corner is isolated for a separate pour.
4-5 minutes to unload. ~1minute to exchange trucks. ~100 trucks\hr
Poor guys, 3C and raining today while it was sunny all week.
B64E7700-7E7F-479C-BCBA-428774E04D81.jpeg
6205AB14-E307-4D11-AD9B-958605B3649F.jpeg
 
Last edited:
10:30 am leaking joint spraying concrete on the south wall.
9ED45CFB-D661-46AC-8B67-6313479F96B6.jpeg

7:05 WB accident watching construction or their phone and not the traffic.
FE7A9C6C-5F56-4778-9F78-287DF8DB2819.jpeg

Where did everyone go, we’re not done yet.
18B920B2-AE63-4C41-A2E5-3CDA3F15266F.jpeg

7:15 EB accident - rubber necker or watching construction.
A2168E8C-9661-4DE2-89F2-00927B8123CE.jpeg

Almost finished by Earth Hour
FD3CA72D-A4C1-46AA-B7C6-B7D4999C439E.jpeg


I find it interesting that just 250 m to the west, the Phase 1 One Pinnacle Condo seems like it is sitting a “normal” foundation on level P6 for the 27m x 29m 65 floor building while the Sugar Wharf Phase 1 70 story 32m x 30m condo is sitting on P4 with ~3m thick base. I wonder if the design difference was triggered by the 5 extra floors or the existing ground conditions or engineering safety/preference?
 