East Bayfront beginning to look like real urban fabric in this photo!
 
That could explain all the accidents. Skyscraper rubbernecking.

Going past this, CIBC Square and other developments further west is like a development/skyscraper geek's gauntlet
 
Going past this, CIBC Square and other developments further west is like a development/skyscraper geek's gauntlet
Yeah, love it:cool:
...a bit off topic but i hope this crazy thought by city council doesn't slow all this construction down:(

7,000 jobs under threat as Toronto moves to restrict critical concrete work for high-rise construction
The City of Toronto is poised to restrict concrete work for the construction of high-rise buildings through amendments to the noise bylaw in a move that will threaten more than 7,000 jobs and cripple the industry's ability to deliver much needed housing supply to Torontonians.
More.... https://www.newswire.ca/news-releas...ork-for-high-rise-construction-859067985.html
 
Last edited:
Advertising inside the pit. See the next picture.
NW corner crane and base prep. almost done. Probably another pour next Saturday; long weekend?
E8D6B3E6-554A-45A6-A9A4-0F2950B85E1A.jpeg

Another photo day with the drone crew. Nice back drop, clear blue sky. Where are their pictures?
5579D816-83E0-4E08-8AD1-F2CDF21D4937.jpeg

Tower core and columns vs podium column thickness exposed.
C7D0398F-4816-4201-AC4C-6AE6499F76EF.jpeg
CDD93392-267C-4D88-A827-9D09196DEFF9.jpeg
305DC29C-253F-4B2C-B665-B6E17A93615A.jpeg

No accidents today.
6E9C9B20-FCEA-4C38-9B0B-C7D796CE8C31.jpeg
 
April 21
They have place gravel on top of the base that will see a concrete floor pour on top of it.
33804967938_5c23e9e3a2_b.jpg

47682435091_8b2f2cc6b3_b.jpg

47629524592_e4f31fc416_b.jpg

33804965018_94983dc5b0_b.jpg
 
They pour ~10’ of concrete for the base and then add a few more for the drains.
39F983AC-1FC5-4261-9D2C-97CD1E574617.jpeg

New construction camera, permanent or for the next big pour. Hopefully they get better weather this time for a good video.
B1F123CD-8EC7-4163-8A02-8929F62385C2.jpeg
67D6BB89-5713-4B88-863F-1724984B5E84.jpeg

April 23
C161B96D-A293-4F0A-ABD1-01E0978FB32C.jpeg
 

Attachments

  • E534B9E7-E39B-4324-A24F-F885C05CDC33.jpeg
    E534B9E7-E39B-4324-A24F-F885C05CDC33.jpeg
    263.1 KB · Views: 363
Saturday.
3 direct pours every 5-6 minutes per truck must have been limited in their distribution. A minimum of 6 hours maybe up to12 hours of non stop trucks.
ADBC7018-5F1B-4B5C-A29C-E4315665C49B.jpeg

3:30 pm 5 pumped lines a lot slower
B84FEBA8-8800-43FB-9489-AF58AE7EAA8E.jpeg

Still pumping 3 lines at 6 pm over 15 hours later
70DE9F54-2329-4CAD-8E52-54A9B3014E7F.jpeg

Sunday - Phase 1 breaking grade.
EB8CE320-FCCC-496C-9F28-2218ADD672FE.jpeg
12436D65-38F8-46D1-877B-DF85594349CC.jpeg

The foundation is set.
Another crane later this week?
DD8238AE-64A5-4ADC-AF02-51262F4F7C9E.jpeg
 