Pretty sure it's actually: Phase 1 to Phase 2 via underground tunnel --> Phase 2 to One Yonge via above-ground tunnel --> One Yonge to Backstage PATH (which connects Backstage and CIBC Square Phase 2) via above-ground tunnel under the Gardiner --> CIBC Square Phase 2 to Union Station via above-ground tunnel over Bay Street.
 
Pretty sure it's actually: Phase 1 to Phase 2 via underground tunnel --> Phase 2 to One Yonge via above-ground tunnel --> One Yonge to Backstage PATH (which connects Backstage and CIBC Square Phase 2) via above-ground tunnel under the Gardiner --> CIBC Square Phase 2 to Union Station via above-ground tunnel over Bay Street.
One Yonge PATH will run from Phase 1 of CIBC Square along the north side of 18 Yonge above CIBC Squares loading entrance, then under the Gardiner. It won't connect to Backstage.

The total bridge length will be about 200m long, so pretty long. By far the longest bridge / connecting section in the PATH network.

Backstage will be a dead end for the foreseeable future, until the TPA garage at the base of Church Street redevelops. When that occurs there will be a PATH extension eastwards to Market Street.
 
One Yonge PATH will run from Phase 1 of CIBC Square along the north side of 18 Yonge above CIBC Squares loading entrance, then under the Gardiner. It won't connect to Backstage.

The total bridge length will be about 200m long, so pretty long. By far the longest bridge / connecting section in the PATH network.

Backstage will be a dead end for the foreseeable future, until the TPA garage at the base of Church Street redevelops. When that occurs there will be a PATH extension eastwards to Market Street.

How confident are we regarding the PATH connection to Sugar Wharf? I think the chances of it happening are pretty low, considering by the time the infrastructure is ready to build the connection, Sugar Wharf will be long built with residents moved in, we'll come back to the same old question, who's going to pay for the construction bills...?
 
How confident are we regarding the PATH connection to Sugar Wharf? I think the chances of it happening are pretty low, considering by the time the infrastructure is ready to build the connection, Sugar Wharf will be long built with residents moved in, we'll come back to the same old question, who's going to pay for the construction bills...?
pretty confident - phase 2 of Sugar Wharf is still ~2 years from construction at minimum and One Yonge phase 2 with the PATH connection should happen in the next year or so given that they are launching sales next month. Timing should line up fine.
 
pretty confident - phase 2 of Sugar Wharf is still ~2 years from construction at minimum and One Yonge phase 2 with the PATH connection should happen in the next year or so given that they are launching sales next month. Timing should line up fine.

Yea, but Menkes needs to build the (3?) highrise towers west of Sugar Wharf to allow for a PATH connection to One Yonge, and that's probably 10 years later. I don't see how Menkes will come back to Sugar Wharf and spend tens of millions of $ on actually building the connection.
 
I am pretty confident it will be built as well. Sugar Wharf PATH Architectural Plan was submitted in September 2019 as well as CIBC PATH connection, north of 18 Yonge.


cibc path_page-0001.jpgcibc path1_page-0001.jpgSugar Wharf Path Architectural Plan_page-0001.jpgSugar Wharf Path Architectural Plan_page-0002.jpgSugar Wharf Path Architectural Plan_page-0003.jpgblock 4a_page-0001.jpg
 
Last edited:
Yea, but Menkes needs to build the (3?) highrise towers west of Sugar Wharf to allow for a PATH connection to One Yonge, and that's probably 10 years later. I don't see how Menkes will come back to Sugar Wharf and spend tens of millions of $ on actually building the connection.
Sugar Wharf Phase 2 is the "3 high-rise towers west of Sugar Wharf" as you call them. It'll take a while, but not forever. In the meantime, the Phase 1 towers will connect underground to the 100 Queens Quay E tower with its new LCBO flagship and offices, as soon as it opens, so Menkes will be able to say they have a 2 block-PATH from day 1.

42
 
Is it possible that Phase 1 will connect to PATH regardless and Phase 2 will join the network when it's built? (as the dotted line in the map under Sugar Wharf project)
(Or maybe it's just an outdated plan since it suggests the connections are independent and not necessarily through One Yonge)
Screenshot from 2019-12-05 14-42-31.png
 
Is it possible that Phase 1 will connect to PATH regardless and Phase 2 will join the network when it's built? (as the dotted line in the map under Sugar Wharf project)
Anything is 'possible' but any PATH that links to the 'network' would need to pass over site of Phase 2 (plus the 1 Yonge complex) so making some sort of temporary PATH seems unlikely to me. Phase 2 is planned to start soon after Phase 1 and the 1 Yonge complex is underway. I suspect we will see a proper PATH link in 4-5 years.
 
Is it possible that Phase 1 will connect to PATH regardless and Phase 2 will join the network when it's built? (as the dotted line in the map under Sugar Wharf project)
(Or maybe it's just an outdated plan since it suggests the connections are independent and not necessarily through One Yonge)
View attachment 218670
Yeah this map isn't a particularly reliable source. It only shows the existing One Yonge development which is south of Harbour Street. The new One Yonge development Sugar Wharf will connect to the PATH through is on the North side of the Harbour Street extension. For some reason they've just chosen not to show it here, likely to avoid advertising a rival development or something like that. Plus there's no way they'd want to build the Phase 2 development around a PATH tunnel. Easier to wait until the whole project is done and have it connect then.
 
Agreed with @TossYourJacket: there is no chance that Phase 1 will connect to the whole PATH network until Phase 2 and One Yonge connections are complete.