hmm - all the posts said a crane was coming down, but these photos show a yellow crane being assembled as the previous cranes were all white. So it doesnt appear a crane was lost, just a replacement likely because the previous one was where the RBC Path connection is.

Yes the old podium centre white tower crane was removed and the new yellow luffing crane was placed on the tower plate.
 
Last edited:
IMG_20140908_141427044.jpg


IMG_20140908_141434778.jpg


IMG_20140908_141452106.jpg



IMG_20140908_141847787.jpg



IMG_20140908_141851018.jpg



IMG_20140908_141917357.jpg
 

Attachments

  • IMG_20140908_141427044.jpg
    IMG_20140908_141427044.jpg
    95.7 KB · Views: 3,220
  • IMG_20140908_141434778.jpg
    IMG_20140908_141434778.jpg
    99.5 KB · Views: 3,214
  • IMG_20140908_141452106.jpg
    IMG_20140908_141452106.jpg
    88.1 KB · Views: 3,202
  • IMG_20140908_141847787.jpg
    IMG_20140908_141847787.jpg
    104.7 KB · Views: 3,194
  • IMG_20140908_141851018.jpg
    IMG_20140908_141851018.jpg
    100.3 KB · Views: 3,180
  • IMG_20140908_141917357.jpg
    IMG_20140908_141917357.jpg
    104 KB · Views: 3,204
For One Bloor, I think I recall them removing the ground level scaffolding by the time they reached the 4th floor. If that holds true for this, then it shouldn't take too much longer before the main level scaffolding is down for this. Is there a general rule of thumb based on floor plate size?
 
IMG_4675.jpg

the joint that connects the movable part under Gardener to ACC.
 

Attachments

  • IMG_4675.jpg
    IMG_4675.jpg
    69.3 KB · Views: 1,368
Does anyone know approximately how often they will be moving/closing the PATH bridge portion under the Gardiner?
 
This morning:


attachment.php


attachment.php


attachment.php
 

Attachments

  • IMG_8689.jpg
    IMG_8689.jpg
    102.3 KB · Views: 3,335
  • IMG_8691.jpg
    IMG_8691.jpg
    101 KB · Views: 3,357
  • IMG_8692.jpg
    IMG_8692.jpg
    98.8 KB · Views: 3,341

Back
Top