Today.
8A92E9DA-83CE-4785-A867-E74C4836810F.jpeg
31508BFA-FE5A-49AE-BD00-889D06B70386.jpeg
EBC5CCAB-D05F-49D5-95FB-3F02C7D8B0E7.jpeg
F2EC82DF-9E78-4615-B44D-B267A321B0D2.jpeg
 

Attachments

  • 8A92E9DA-83CE-4785-A867-E74C4836810F.jpeg
    8A92E9DA-83CE-4785-A867-E74C4836810F.jpeg
    272.2 KB · Views: 602
  • 31508BFA-FE5A-49AE-BD00-889D06B70386.jpeg
    31508BFA-FE5A-49AE-BD00-889D06B70386.jpeg
    268.6 KB · Views: 595
  • EBC5CCAB-D05F-49D5-95FB-3F02C7D8B0E7.jpeg
    EBC5CCAB-D05F-49D5-95FB-3F02C7D8B0E7.jpeg
    237.7 KB · Views: 611
  • F2EC82DF-9E78-4615-B44D-B267A321B0D2.jpeg
    F2EC82DF-9E78-4615-B44D-B267A321B0D2.jpeg
    270.6 KB · Views: 598
Boy does it ever take time to put up a building when it's over a subway line !
 
Last edited:
Meanwhile construction is wrapping up on the three projects beside Wellesley station Totem, Vox and 50 at Wellesley Station which started around the time TeaHouse begun.
 
I'd rather them take their time building over the subway, than having them rush through and end up potentially breaching the tunnel which would paralyze transit throughout the entire city.
 
Here's what I could see from the amenity terrace at Century Plaza yesterday evening:

DSC07504.jpg
DSC07506.jpg
DSC17505.jpg


42
 

Attachments

  • DSC07504.jpg
    DSC07504.jpg
    813.4 KB · Views: 557
  • DSC07506.jpg
    DSC07506.jpg
    365.3 KB · Views: 548
  • DSC17505.jpg
    DSC17505.jpg
    423.6 KB · Views: 529

Back
Top