RyanD
Active Member
Is there a rental component here?
Does anyone know why they had to change the cranes for this construction? The roads were all closed off last weekend when I was in the area.
Correct. Site constraints until they could clear the adjacent Quantum podium.Something I learned from talking on the sky Tower thread is luffing cranes are much slower than a hammerhead so could have been due to site constraints they needed to use that crane till they reached the podium and could switch to a hammerhead
Thank you for the info...Something I learned from talking on the sky Tower thread is luffing cranes are much slower than a hammerhead so could have been due to site constraints they needed to use that crane till they reached the podium and could switch to a hammerhead