kettal
Banned
The entire tunnel from Yonge to Don Mills??
The LRT's can't use the subway tracks and then there's a lot of infrastructure (over head power wires) to go in. I think a year is optimistic.
LRT's can use subway tracks, they are the same gauge. The overhead wire can be installed at night, when the subway is still running. The only time the subway will have to close is during platform reconstruction.