ehlow
Senior Member
Thx for the info. And sorry for bringing it up again. Perhaps I was confusing things with how it was to be operated with the SRT rebuild. I recall their being a hubbub a few years back when there were claims the entire Crosstown and SLRT wouldn’t be able to run as a continuous line from Black Creek to Markham Rd. I’m not even sure if that’s correct, or if I’m making it up. Too many plans, too many changes, hard to find reliable info.
But if it was true; I get that the headways would have to be different for each section, and that certain trains would have to turn back at Laird or Kennedy. But I don’t see why the Crosstown and SLRT couldn’t have been run as one route. Even if 1 /4 of the trains did the complete trip, it probably would’ve been popular to some.
No problem. You're right, they planned to run the Scarborough LRT and Eglinton LRT as separate lines originally (pre-2010). There was also the confusingly named "Scarborough Malvern LRT" which would've continued along Eglinton east of Kennedy as yet another separate line.