innsertnamehere
Superstar
Yup. There is a reason MTO builds new freeways for $10-30 million / km.
|
|
|
You're missing the Line 2 eastbound extension to Port Perry.Here's what I think the TTC subway system will look like in 2045
<snip>
Those won't happen until the 2100s at least.It needs more east west routes like on Major Mack or 16th Avenue perhaps.
nah the Yonge branch needs to be tunneled in a straight line under the Yonge alignment the entire way. Maybe the tunnel could be run under Lake Simcoe and then come out slightly east of BarrieThe Line 1 extensions could be extended even further to go around Lake Simcoe and then connect with each other on the north side of the lake to create a gigantic belt line.
Could you imagine trundling from Barrie to Union in a TR, rolling through countyside? Why on earth would anyone want to do that?
I doubt Line 1 will ever be extended to Major Mack, much less Barrie.