Looks like 4444 and 4445 will finally enter service Tuesday, though I not sure if 4444 will since it out for testing.
4445 has been in the service Bay since last week after racking up extra burn in and has just been moved to the yard.
4444 until last week, has been in the service bay since arrival and has burn in more than the require distance since then. It has been out since 10 pm last night with a few hours at the barns and still out, but on its way to the Barns. It was in service on 505 and 506 testing the system to the point it went to High Park while on 505.
4446 is not tracking yet.
Not sure if TTC trying to get ahead of the failure rate before going into service, or still poor quality coming from the plant, but cars are taking longer to see service, but not as bad as some. There has only been only 2 car in the last few months that has gone into service in the 8-10 day time frame. 4444 has been here 18 days and 4445 13 days. Since 4438 that was 10 days, the others have been about 14 days.
At the rate things are going, BBD is starting to loose the NA market and doesn't blow well for it in the long run.
Both TTC and Metrolinx need to go to the market on all future order to protect their rear for both price wise as well delivery time frame. They needs to look at the quality to make sure it meet failure requirements. The new streetcars so far have fail the mean test and teeth time is over, considering BBD has already had an extra 2 years by being this late. Other than a coach or 2 by existing customer for BBD Bi-Level cars, BBD has lost that market in the US already. Only GO Transit getting those cars today.
TTC should not allow BBD to bid on the next order of TR's, let along the option for the new streetcar fleet.