Ozman
Active Member
Does the mechanical area extend far enough north to be over the Crosstown line? I heard that the platform extension would be longer than that and as a result they would have to remove the pocket track north of Eglinton Station. Last I heard they had not decided whether to close off the south end of the platform or just leave an extra long platform.It's actually less invasive than that as the platform area already exists so no earth or structural pieces will be removed for Eglinton subway station modifications.
They will move the current mechanical area from the North end of the platform to a new room (existing South end passenger space?), then shift the passenger space north into the previously occupied area. This is better centred with the new LRT station beneath the subway.
Maybe they could spread out the crowds on the (centre) Line 1 Eglinton subway platform by having southbound trains stop at the southernmost end of the platform and northbound trains at the northernmost end. I just don't know the length of the platform extension and thus how much overlap of SB and NB boarding areas there would be.