81-717
Active Member
Perhaps we can find a way to get subway trains to last 50 to 60 years ... which will surely happen if there's no funding.
Which will surely cost more than new trains, meaning that without funding we can't have one or the other.Then the TTC will need new, more rigorous design standards for their track and structures to handle the heavier equipment. Plus a plan (and budget) with which to replace all of the existing with the new.
Dan
I'm curious though as to whether there is indeed a direct correlation between how heavy the equipment is vs. its design lifespan? Montreal's equipment isn't heavier than Toronto's, yet they want to have it last 60 years.




