rbt
Senior Member
Remember that the Sheppard stations are roughed in for 6-car Subway trains, but finished for only 4-car trains. They could start lowering the platforms for the unused parts of the stations, to shorten the time for reconstruction from high-floor platforms to low-floor platforms.
They could run 2-car trains at 2 to 2.5 minute frequencies (higher capacity than they run today) and convert the other half of the current station size.
The most difficult items to convert are actually the escalators and elevators. Both may be left with a ramp up to them.
I personally don't think we should attempt to convert the stations. The transfer planned at Don Mills will not be much of a burden (no grade change, short walk, fairly short average wait)