I think there's been a serious misunderstanding about what this report says.
http://www.waterfrontoronto.ca/uplo...front_transit_options___february_6_2013_1.pdf
From the project objectives:
"Develop an interim solution or phased implementation of the EA Solution and Queens Quay Vision"
In other words, the contents in this report are for a stop gap measure until East Bayfront LRT is complete.
The pedestrian walkway and streetcar options were eliminated due to cost. The only thing being considered at the moment are
- Wellington Bus
- Bay Street Bus
- Various BRT options.
This report doesn't preclude the construction of the East Bayfront LRT or expansion of Union loop.
Of course it's ridiculous that we're spending money on an interim solution, when this thing should've been done since day 1, but this isn't as bad as I had thought.
http://www.waterfrontoronto.ca/uplo...front_transit_options___february_6_2013_1.pdf
From the project objectives:
"Develop an interim solution or phased implementation of the EA Solution and Queens Quay Vision"
In other words, the contents in this report are for a stop gap measure until East Bayfront LRT is complete.
The pedestrian walkway and streetcar options were eliminated due to cost. The only thing being considered at the moment are
- Wellington Bus
- Bay Street Bus
- Various BRT options.
This report doesn't preclude the construction of the East Bayfront LRT or expansion of Union loop.
Of course it's ridiculous that we're spending money on an interim solution, when this thing should've been done since day 1, but this isn't as bad as I had thought.