For starters. You stop building new stuff before flood mitigation is completed. East Village is insanity.
If you go back and look at flood photos of the east village you can see how much flood mitigation was done by raising the land.

The land was raised by quite a bit!

92974D34-EEEC-4FAB-87D9-FA41C92D5CE7.jpeg
 
Same situation with Riverfront Pointe (sp?) the Point of View project by Booker's. When the flood hit they weren't affected because they had built up by 4 or 5 feet iirc. I remember them raising the road to match the raised height of the building's base.
If you go back and look at flood photos of the east village you can see how much flood mitigation was done by raising the land.

The land was raised by quite a bit!

View attachment 272133
 
Also, the lot in Eau Claire that Concord is on didn't flood.
 