News   GLOBAL  |  Apr 02, 2020
 9.5K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

Coquitlam Central from Evergreen Facebook:

12814754_1135713256475177_2937301846846428771_n.jpg

https://www.facebook.com/evergreenline

12832292_1135713213141848_627429023401662126_n.jpg

https://www.facebook.com/evergreenline
 
Posted by SpongeG on SSP:

SpongeG;7434152 said:
may 5/6 2016 burquitlam station

20160505_173105 by snub_you, on Flickr

20160506_190709 by snub_you, on Flickr

fancy lights or art?
20160506_190714 by snub_you, on Flickr

Posted by MIPS on SSP:

MIPS;7431382 said:
There's a MK III that's been loitering on one of the side tracks at OMC for a few days now.

CGS_1308.jpg


It must be one of the new arrivals as there's still plywood on the ends. Also, all of the windows in comparison to the MK II are massive.
 
Firefighter training in the Evergreen Extension tunnel:

dpogue;7532556 said:
A view of the progress in the tunnel:

Cpb7RjrUMAAGsiz.jpg

(from https://twitter.com/iafflocal1782/status/763073484171845632)

So it looks like the power rail, running rails, and LIM reaction rail are installed, but I don't see the ATC cabling, radio cables, or side walkways.

**************

MKIII trains came into service on the Expo Line TODAY:

http://www.cknw.com/2016/08/18/new-expo-line-train-to-improve-passenger-comfort-and-capacity/

http://www.news1130.com/2016/08/18/new-skytrain-cars-coming-to-expo-line/

 
From SSP:

Waders;7555499 said:
The B.C. government announced today the Evergreen Line will be up and running before Christmas.
Source

ilikeredheads;7560485 said:
Millennium line trains will stop running between Waterfront and Columbia starting Oct 22
https://imgur.com/gallery/lgFmw

Starting Oct 22 until opening of Evergreen extension:
Expo line runs from Waterfront to Columbia, then branches out to either King George or Production Way/University
M line runs between VCC/Clark and Lougheed Town Centre

wbgGZZb.jpg


mDchIzB.jpg


I8UA0uL.jpg
 
Last edited:
From SSP:

Heading eastbound:


YouTube of the tunnel with detailed commentary.


The Evergreen Extension opens Friday, Dec 2nd @ 12 noon.

SkytrainCar026;7637059 said:
Translink employees were handing out these pamphlets at Waterfront station. Sorry about the quality of the images :D

The front and back
ab9ddu8rc5eqrnlzg.jpg


Travel times. Slightly confusing, they made the extension green instead of yellow.
8r4fa64dldcvagazg.jpg


First and last trains
338i4f9h1wacupdzg.jpg


Info and renders of the new stations
wr8ayr59uhpscr3zg.jpg


A new transit and bus map on the inside
tc7vfahhuyhysgozg.jpg


A little piece about farezones
baa96aft1ubsws3zg.jpg
 
Last edited:

Back
Top