News   GLOBAL  |  Apr 02, 2020
 9.4K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.3K     0 

Adjei

Senior Member
Member Bio
Joined
Apr 6, 2013
Messages
2,172
Reaction score
1,164
New bus terminal to be built next to the Vaughan Metropolitan Centre subway station:

1633b3992e701e81f17a72d05364948b.jpg


e6bd0d42d7b030165db29b86df058cd2.jpg


1d2b496b15c2326528cb8331891545ab.jpg


a45d734f770f3520fd25c6fff6151e36.jpg


Architect is Diamond Schmitt
 
It also needs a bay for the shuttle bus to IKEA, just like with both Kipling and Leslie Stations.
 
It also needs a bay for the shuttle bus to IKEA, just like with both Kipling and Leslie Stations.

TTC has never given IKEA a bus bay and it is done off street at Leslie and in the south parking lot at Kipling. Be very surprise if it happen here at all.
 
not really, the bus terminal is on one end of the platform, the main entrance is on the other. Even if the platform was built right up to highway 7 it wouldn;t end until half-way through the KPMG block.
 
Last edited:
Forcing riders to walk 150m through a tunnel at Vaughan Centre just to transfer is almost as ridiculous as forcing people to walk 150m+ to transfer between YUS and a DRL underneath Wellington St, as some proposed by some people here.
 
Forcing riders to walk 150m through a tunnel at Vaughan Centre just to transfer is almost as ridiculous as forcing people to walk 150m+ to transfer between YUS and a DRL underneath Wellington St, as some proposed by some people here.

150m is nothing
at least its not as bad as taipei....they have an interchange where firstly its 400m away to the overlapping line and you have to go up 2 flights and back down 1 flight of stairs just to get to it
 

Back
Top