CplKlinger
Senior Member
The giant pit next door must be a "future recreational lake"View attachment 634641
“future train”
Regency looks after its websites like it looks after its empty lots it seems.
The giant pit next door must be a "future recreational lake"View attachment 634641
“future train”
Regency looks after its websites like it looks after its empty lots it seems.
AmenAnd hopefully we see it wrapped in a nicer design than what they started with...
And then the countdown begins on when the adjacent pit gets filled with new construction. Lord please let it be a short countdown.I have asked when the second building will finish construction, and they said it is projected to finish by this July, with tenants "hopefully" moving in by this September.
I would assume so as the last of the existing row houses are being boarded up as the leases expire. The entire next section is nearly ready to be demoed.And then the countdown begins on when the adjacent pit gets filled with new construction. Lord please let it be a short countdown.
They are boarded up. A former resident posted a few photos on Reddit.I would assume so as the last of the existing row houses are being boarded up as the leases expire. The entire next section is nearly ready to be demoed.
They are boarded up. A former resident posted a few photos on Reddit.
Can anyone confirm if indeed these are the Phase 2 smash downs of the Holyrood slum?