News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. U

    Toronto Toronto | Ontario Line: Science Centre Station | ?m | ?s | Metrolinx | HDR

    Anyone may think this if they wish. People who would spend 2 hours each way on transit coming in from Markham would continue to drive their cars for 30 minutes if they had the choice. It is always frustrating for those who doesn’t live in downtown to hear some entitled downtown residents say...
  2. U

    Toronto Toronto | Ontario Line: Science Centre Station | ?m | ?s | Metrolinx | HDR

    That parking lot is very important to visitors. Many are coming with small children in a car from the suburbs. If anything, they should expand the parking lot by making it a multilevel parkade.
  3. U

    Sheppard Line 4 Subway Extension (Proposed)

    Consumers and VP will only get one station. It makes no sense to have a consumers station when the majority of the business park is not in comfortable walking distance. More likely a shuttle bus doing loops from the station. Agincourt GO and Kennedy will also share one as well. You can just...
  4. U

    Sheppard Line 4 Subway Extension (Proposed)

    Sheppard East has some of the highest development potentials in all of Toronto. If the government is serious about housing, they would build a subway quickly and let the condo towers rise. It might even attract some businesses away from places like Mississauga to the consumers road business park.
  5. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Their website had no more Space to fit new contents and Pemberton hasn’t had the Time to make more.
  6. U

    Ontario Science Centre

    There is a new public school planned in one of the empty lots next to the science center.
  7. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    I’m loving the this building more everyday. I passed by the construction site last week and the building is turning out to be better than I had even imagined. This is perfect for the area and just what the neighbourhood needs. The balance between aluminum cladding, spandrel, and glazing is very...
  8. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Many are angry because they live in the area, and this building is introducing a level of density they don’t want or are blocking their previously less obstructed view. NIMBYism downtown style in a way. The building was designed to look like a building wall of several different structures...
  9. U

    Hamilton Toronto | 647 King Street East | 19.51m | 6s | Prizzi Mehta | Antrix

    Now that is one ugly building.
  10. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    this is actually 4 separate buildings connected to each other. elevators will not be any more of an issue than any other condo towers built in the period. I'm interested in fire alarms frequencies though, and also whether the entire building cluster would go off in the same time.
  11. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    the area needs an 11K SF Chinese Buffett. Someone call dragon pearl
  12. U

    GO Transit Fleet Equipment and other

    It’s the difference between concentrated motor vs distributed motor operations. Strict definition of a multiple unit is a fixed set-up of motor and trailer units capable of bi-direction operation. Even though it’s popular to categorize EMUs as distributed motor units with some self propelled...
  13. U

    GO Transit Fleet Equipment and other

    Technically, 12 bi-levels with 2 electric locomotives set up one on each end is an EMU. So never say never.
  14. U

    Toronto Toronto | 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    That building is Toronto’s only portal to the Internet. If it is gone, you will be the prime suspect. Better watch out for those angry teenagers.
  15. U

    Toronto Toronto | Bayview at the Village | 37.5m | 10s | Canderel | Graziani + Corazza

    Did construction on this one stop? Doesn’t seem to be a lot of activity.
  16. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    No I think to off-set the rising construction prices, this development may add 10 more floors to the condo in order to recoup addditonal profits. I believe their planning rational could likely refer to the attractive architectural aesthetics of the building’s original design and highlight the...
  17. U

    Eglinton East LRT | Metrolinx

    That’s why they call it the next generation of transit networks. Literally for the next generation.
  18. U

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Can’t wait for the towers! Happy holidays everyone.

Back
Top