News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.7K     0 
  1. T

    Yellowhead Trail Upgrades

    I’m guessing that there will be construction on the Yellowhead alignment crossing the 118 Street bridge.
  2. T

    Alberta Politics

    Edmonton proper would have 22 seats. The metro areas would have about 8-10. About six for Metro Calgary..
  3. T

    Edmonton Oilers

    The Oilers goals against dropped from 3.34 (before the trade deadline) to 2.95 (after the trade deadline).
  4. T

    LRT Safety

    I like the seat configuration on the Valley Line cars. The seats facing across seem to be half-occupied.
  5. T

    Edmonton Oilers

    The Ducks have great coaching (Quenneville).
  6. T

    Edmonton Oilers

    It doesn’t help when Quinn Hughes didn’t want to re-sign with the Canucks.
  7. T

    Alberta Politics

  8. T

    Capital Line LRT

    https://mailchi.mp/edmonton/construction-notice-capital-line-south-lrt-extension-17474734?e=e1dbf70103
  9. T

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    https://vlwcommprod.blob.core.windows.net/vlwcomm-files/04b41217-329b-495e-8512-f04787cb4a67-b324511f-d2e4-4272-ac7e-d935591eabee-Traffic%20Shift%20near%20175%20St.pdf
  10. T

    LRT Safety

    I’d like to see the police arrest open drug users during Rogers Place events and Oilers games
  11. T

    Alberta Politics

    ICPOO
  12. T

    The Edmonton Method - Snow Removal

    I wonder how many of the parked vehicles on the street have no insurance.
  13. T

    Edmonton Oilers

    All the Oilers need is one point to clinch home ice.
  14. T

    Homelessness, Addiction and Mental Health

    https://edmontonjournal.com/news/local-news/advocates-call-for-reset-on-downtown-safety
  15. T

    Edmonton Oilers

    Hyman’s back:
  16. T

    Valley Line LRT | TransEd/Marigold | City of Edmonton

    https://vlwcommprod.blob.core.windows.net/vlwcomm-files/46321158-7241-4e5c-97af-8c930bb73cee-73c5e9d1-9b39-4dbd-8029-b62b791a8984-102%20Ave%20Full%20Closure%20-%20Phase%201.pdf

Back
Top