They are going to submit their application for registration very soon. I think it takes a long time for the city to process it. It should be done by mid-December, but since December is a slow month everywhere, they are saying January.
RE Chipped Steps:
Again, does anyone know of any legalese surrounding the condition of common areas before the building is turned over? Is the builder required to fix chipped/stained pre-cast on the outside of the building? Do the steps need to be fixed? Will scratches on the elevator doors and bad paint jobs in the hallways be corrected?
How can we ensure this stuff is looked after before they hand us the building?