Some more bike count info via @Chealion - the city has added some more counters and even has one for Nose Hill.
http://www.eco-public.com/ParcPublic/?id=4190
http://www.eco-public.com/ParcPublic/?id=4190
|
|
|
Good numbers for the end of October considering we are only supposed to bike 2 months of the year
#yycbike Counter @yycbike_count
Mon Oct 31 #yycbike trip counts:
10 St: 402
7 St: 452
Peace Bridge: 1150
Stephen Ave: 389
8 Ave: 712
5 St Mdn: 664
12 Ave Mdn: 435
Construction has started on pathway underpass for Baines Bridge (the zoo connector off Memorial). Excited for this one as that was a pain having to go across the road there. Hoping they repave that entire stretch through the zoo as part of this as it has some of the worst tree root speed bumps
Ah, I think I saw, but didn't know what it was supposed to be used for. I saw what looked like a tunnel under construction. That is very good news indeed.Construction has started on pathway underpass for Baines Bridge (the zoo connector off Memorial). Excited for this one as that was a pain having to go across the road there. Hoping they repave that entire stretch through the zoo as part of this as it has some of the worst tree root speed bumps
Wow, what a difference some paint makes to what was a drab archway on the Sunnyside path where it goes under the LRT:
Bow river pathway closure in West Eau Claire starting September 5:
http://www.calgary.ca/CSPS/Parks/Documents/Pathways/Closures/Bow-River-Pathway-West-Eau-Claire.pdf