CBBarnett
Senior Member
For the layers of architect and consulting grift that is going into this tree memorial thing - let alone a project with many hundreds of millions in public funding - we probably could have bought 5,000 elms to replace all the street trees within a 10 block radius.LOLOL I cant believe this is still a thing. Aside from saying nothing in that diatribe that's different than what was on city website, the biggest winners btwn the elm and the stephenson building were the design team...who with minimal effort score huge political/cultural/art points, and can fill multiple pages on the design brief. (love the stephenson building integration btw, it's the elm that is the dumbest shit)