It can't be torn down soon enough.As a resident of Vetro, and avid user of the overpass, I can’t wait until piss-ramp is torn down. I am thinking of throwing a parking lot party the day it finally comes down.
|
|
|
It can't be torn down soon enough.As a resident of Vetro, and avid user of the overpass, I can’t wait until piss-ramp is torn down. I am thinking of throwing a parking lot party the day it finally comes down.
The way that bridge is aligned makes me think that the Big 4 Building will need to be demolished before this project is complete. Does anyone know if that's the case?
Between now and October, crews will be removing all the staircases to the LRT station—along Macleod Trail and from Stampede Park—and in their place, adding new, accessible street-level pedestrian crossings at Macleod Trail to the station and street-level access across the LRT tracks into Stampede Park.