J_gordo
Active Member
https://dailyhive.com/vancouver/surrey-langley-skytrain-new-cost-opening-date
Another transit project with ballooning costs…
Another transit project with ballooning costs…
It reminds me of the Ontario line; it went from ~10 billion to ~ 17 billion to then a massive $27.2 billion, the last increase occurred over a year and a half span. It’s not just Edmonton or LRT projects, every construction project is becoming more and more expensive.Truly insane and deserving of a national review by a working group.
How an estimate 'by professionals' in 2022 is 100% off only 2 years later leaves me asking A LOT of questions on both sides of the equation.
$375m/km, albeit 90% elevated (short at grade section through undevelopable flood-prone farmland, that'll likely require piles and enough grade to be over the flood level)https://dailyhive.com/vancouver/surrey-langley-skytrain-new-cost-opening-date
Another transit project with ballooning costs…
An 8km stretch of road widening on Highway 1 in Abbotsford area is costing $2.65 billion. That's $331 million for 1km of road widening.https://dailyhive.com/vancouver/surrey-langley-skytrain-new-cost-opening-date
Another transit project with ballooning costs…
Nope, car again. Glad there are no injuries.There appeared to be an accident at the 112 Ave crossing. I didn't see a vehicle involved so it may have been a pedestrian, cyclist, etc.
Nope, car again. Glad there are no injuries.
![]()
Edmonton LRT train involved in crash after vehicle drives onto tracks: ETS
No injuries were reported after a collision between an LRT and a vehicle on Tuesday morning.edmonton.ctvnews.ca
And while the crossing arms were down.
Nope, car again. Glad there are no injuries.
![]()
Edmonton LRT train involved in crash after vehicle drives onto tracks: ETS
No injuries were reported after a collision between an LRT and a vehicle on Tuesday morning.edmonton.ctvnews.ca




