What do you think of this project?

  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    30
Used to be able to add the word cups after grey, but sadly not lately. I am going to try and be optimistic here about the building, at least activity is happening now and perhaps a change is better than nothing.

I still really want to see Studio 53 here though!

Yes it's good to finally see some activity here, and this will probably look fine, I just wish this obsession with painting buildings grey would end that's all.
 
F1EF6683-9F52-439C-B7C2-0CF3D61A3706.jpeg
 
Reference ID: Job No 451087486-002
Description: Other
Location: 10058 - 102 STREET NW
Plan NB Blk 2 Lots 79-81
Applicant: DUALITA ARCHITECTURE
Status: Intake Review
Create Date: 10/17/2022 6:57:30 PM
Neighbourhood: DOWNTOWN
 
I hope all of the street level will be glass. Was there any plans to have any CRU's along Jasper ave?
It is a beautiful and distinctive building. I think it was a mistake to put so much concrete wall on the main and second level which gave it such a bunker feel, but I guess that was the trend back then.

Yes, now is the time to fix that.
 

Back
Top