It should start picking up now. The theater section is being formed.
Jul 18, 2022 |
Commercial Final |
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music |
$8,500,000 |
10210 - 97 STREET NW |
What's the purpose of breaking the BPs into phases like this? Quicker turnaround time for the city?BP:
Jul 18, 2022
Commercial Final
STRUCTURAL FRAME ONLY 2nd level of above grade "music box superstructure" on top of the first level of the above grade superstructure (B.P. 341529008-036) and the existing one storey underground parkade (B.P. 286547690-002). Remainder of building to follow in separate permit submission-- "Francis Winspear Centre for Music
$8,500,000
10210 - 97 STREET NW
What is the street/ave this is being constructed?
+ or -Then let me reconfirm what you are hearing from everyone else.
So should we be preparing for a watered down, bait and switch version of the original plan ala the Stanley Milner LibraryIsh... but from what I understand there have been multiple changes in scope, budget and design.