Shunting requires labour, which is in short supply. There IS a link between the number of shunting moves planned and the number of staff available for revenue service.Second point: bringing up the crew shortage in a discussion about why refurbed rolling stock is not being used is a red herring. There is no link between having X amount of crews and being able to run Y rolling stock unless we subscribe to the frankly baffling line of thought here that Metrolinx cannot use the refurbished cars unless they have more service. For the third time, I am saying that it is entirely possible to use all the equipment, but using each car less frequently.